News

DP2 Zwerver II carries out wire lay operations!

Our DP2 Zwerver II was hired to arrange a wirelay of pullwire,  combined with ROV operations.

The pullwire had to be laid under special circumstances, in a smooth curve around guiding piles over a distance of approx. 7 km.

The ROV operations took place simultanuously during the wirelay and the pipe-pull.

References