News

“Zwerver I” shows her value on long term dredging scope Kuwait!

Our “Zwerver I” recently finished a long term contract with Van Oord Dredging & Marine Contractors BV in Kuwait.

The vessel was involved in the large land reclamation project for KNPC, which started in August 2014 and is still ongoing. (more…)

Our Multi Purpose DP-2 Support Vessel “Zwerver II” chartered by Jan De Nul NV, finished her scopes on the Burbo Bank Extension Offshore Windfarm project.

During the last months, the vessel carried out post trenching operations and mattress installation on the export and array cables in the windfarm area with waterdepths varying between 5 and 23 mtr. (more…)

Our Multi Purpose DP-2 Support Vessel “Zwerver II” is chartered by Jan De Nul NV on the Burbo Bank 2 Offshore Windfarm installation project.

Our scope of work is installing mattresses as well Pre-lay as Post-lay. We succesfully installed over 100 mattresses in about 3 weeks.

The vessel also assisted during the beach-pull of the export cable. All operations carried out in DP-2.

Our new Multi Purpose DP-2 Support Vessel “Zwerver II” is successfully christened on 28th April 2016 in Harlingen by the owners daughter Ms. Matilde van Stee.

After a nice cermony, just before the rainshowers, all visitors, clients and families toasted with us on the new addition to our fleet.

Thereafter everybody took the time to make a tour over and through the impressive vessel. (more…)

With our Multi Purpose DP-1 support vessel “Zwerver III” we mobilised in Rotterdam for Boskalis Hirdes EOD Services GmbH during March 2016.

Our client installed a Workclass ROV spread on the deck of the vessel, where after she headed to Lubmin for a UXO investigation/recovery campaign on Wikinger Offshore Windfarm in the Baltic Sea.  All operations are mainly carried out in the shallow waters area on DP.

References