News

DP2 “Zwerver II” joins Cobra cable project again!

The DP-2 “Zwerver II” has joined the Cobra project again during March 2019.

Her scope of work was Anchor-handling and position keeping of the Cable Lay barge on her cable route.

Again the vessel showed her capacities with her powerful DP-system.

The project was finished during June 2019.

References