News

The “Zwerver II” finished the beach nourishment project at Bournemouth/Poole (U.K.)

The “Zwerver II” finished the beach nourishment project at Bournemouth/Poole (U.K.). She took the floating line on tow for Rotterdam.

The “Zwerver II” started the beach nourishment project at Bournemouth/Poole (U.K.) for Westminster Dredging Company. She had to support the TSHD “Oranje” with connecting of the floating line, movement of the sinkerline, crewchanges etc.

The “Zwerver II” has finished the project in Angola for Saipem s.a./Petromar. The “Zwerver II” was involved with the movement of the “ROSA BHOR” riser pipe (Length 1.500 m, Ø ±4000 mm) from Soyo through a lagoon near the Congo River to definitive position at sea. She was also assisting a CSD which was dredging in the lagoon.
The “Zwerver II” left Angola for Poole (U.K.).

After the completion of the project in Morocco, the “Zwerver II” left for Angola. She is in Angola under charter with Saipem s.a./Petromar.

The contract of the “Realisation of the new port of Tanger Mediterranean 1” in Morocco has been successfully finished at the 31st July 2006. The “Zwerver II” was in charter with the consortium S.R.P.T.M.(Saipem s.a.) for two years. The vessel was responsible for all the main supplies, anchor-handling/supports of pontoons, stone barge-handling and towage/positioning of caissons on this project.

References