After finishing the “Riffgat UXO removal project” the “Zwerver III” started in the Baltic Sea for VSMC-Boskalis Offshore.
The scope of work is Jointing and burial operations on the Baltic II OWF Export cable.
Jointing- and touch-down operations were controlled by the “Zwerver III” with a Echoscope survey tool, installed on the vessel.
Burial operations were done with a Massflow tool of Reef Subsea, installed as well on the “Zwerver III”