Walk-to-Work operations

Our vessels DP2 “Zwerver I” and DP2 “Zwerver II” are suitable for Walk-to-Work operations. The DP2 “Zwerver II” has a passive heave compensated gangway system fixed installed, and is able to perform personnel transfers up to Hs 1,6 m.

On the DP2 “Zwerver I”, it is possible to install a walk-to-work system. The motion calculations are in place of several Walk-to-Work systems, of which can be fitted on the vessel on short notice.

References