Our DP-1 “Zwerver III” has supported the Sur de Texas Tuxpan pipeline with diving operations on 4-point mooring for the past 14 months.
The operations mainly took place in shallow waters, and vessel accommodated 21 persons during the project. (more…)
The DP-2 “Zwerver II” has joined the Cobra project again during March 2019.
Her scope of work was Anchor-handling and position keeping of the Cable Lay barge on her cable route. (more…)
The DP-2 “Zwerver II” mobilised during January 2019 for the NEMO Link trenching scope.
A ROV trencher of Modus Seabed intervention was mobilised on board.
Our DP-1 “Zwerver III” continues her operations in Mexican Waters until April 2019.
She is involved in supporting the Pipelay operations for Sur de Texas Tuxpan pipeline installation. (more…)
Our DP-2 “Zwerver II” has recently finished her operations on the Cobra Cable project in The Netherlands.
Her scope of work was mainly to ensure the position keeping of the Cable lay barge on DP-2. Due to the “Zwerver II” her powerful DP-system, she was able to maintaining the position of the Cable Lay barge.